8.18.2023

Many new impressions

The world's most perfect teenager has now had two days of school in his new school building. The class he is in consists of 17 students, of which 7 are new arrivals.

When we got home from work after his first day of school, he was already in bed and asleep even though it wasn't even 7pm.

The school building was originally a teaching facility for the first 100 years and then converted into a conference facility. For the last 7.5 months, they adapted the building's 100,000 square meters (10,000 square meters) for the school.

During the opening speeches from both the school's and the landlord's representatives, it was emphasized how well the work had gone and that it was almost complete. I have more than 15 years of experience in the construction industry and could visually determine during the tour that they are significantly further from completion than what was stated.

For example, the school cafeteria is not completed. As a solution to this, the school must provide prepaid cards to each student. Unfortunately, the school has not received enough cards so returning students have had to arrange lunch themselves so far this week.

Despite everything, I am grateful that the school was given access to the building.


No comments:

Post a Comment

I take my hat off to Ms. Taylor Swift

This week, the talk of the town in Sweden has been Ms. Taylor Swift when it comes to finances. Ms. Taylor Swift gives 3 concerts in Solna ci...